for which it stands, one nation, under God, indivisible, with liberty and justice for all. Roll call please. Commissioner Scavdahl? Here. Commissioner Levy? Here. Commissioner Mulder? I mean, why did that not come out? Okay, Commissioner Fulton? Here. Commissioner O'Neill? Here. Commissioner West? Here. Commissioner Curiazzi? Here. Commissioner McFarland? Here. All right. We have a full house. And welcome, Commissioner Fulton, to the Planning Commission. Director Ford, do we have any agenda modifications this evening? We have no modifications to the agenda. The only thing that is...


6:02 p.m.

Different is a letter from BLM that's on the dais and this is in related relationship to item number F what well one and following Okay, thank you, we'll take that up later At this time we have public comment on non-agenda items So if anybody wants to appear before the Commission on any matter pertinent to our jurisdiction that is not on the agenda now is the time to do so and I'll check in the room first To see if anybody would like to dress the Commission I don't see anybody with hands up and I'll check online and Doesn't look like we have anybody online right now. So I will close public comment on non-agenda items before We take up the consent agenda and public hearing I'll ask


6:03 p.m.

The commissioners, do any of you have any conflicts or ex parte disclosures related to any item on this evening's agenda? Yes, I do. Commissioner Fulton, you do, and on item two on the consent agenda? Yes. So I'm going to propose we split the consent agenda into the two items. We'll take up item one with the full commission present, and then item two, Commissioner Fulton, we'll ask you to step out of the room while we take that up, and you can just step outside the door, and then we'll let you know as soon as a decision is made, and then we'll bring you back in for the rest of the meeting. So we'll open the consent agenda. There's two items on consent this evening, and as I indicated, we'll take them separately. I will check with the commissioners.


6:04 p.m.

After I read the item to make sure to see if any commissioners have any questions or want to pull an item from consent and I'll also check with the public that's in the room and or online. So first item is Conklin Creek Farms Incorporated Special Permit and Zoning Clearance Certificates Modification in the Petrolia area. And commissioners? I do have a, I think, very brief question about that, which I wanted to ask before we vote, if possible. Okay. Can you hold that for just a second? Oh, yes. Let me just check with anybody in the room. Is anybody in the room interested in pulling this item? And anybody online, please raise your hand, but I don't believe we have any attendees online right now. Is that correct, Director Ford? Correct. There's somebody online. Okay. Yeah. Thank you.


6:05 p.m.

If it's all right with the rest of the commissioners, can we, we'll just take Commissioner Levy's question. If you all don't mind, I appreciate that. Yeah, I just want to note that I fully support this project. I particularly appreciate the technical memorandum that was submitted by North Point. However, I'm a little confused by the references in a couple places in the staff report to the 2.6 million gallon rainwater catchment system, which we're switching from that to the groundwater to the well. And it does say in the first paragraph of the executive summary and elsewhere, including in the technical memorandum, that 655,000... gallons is how much is expected the annual water usage. But there's still a reference later in the staff report to...


6:06 p.m.

The use of 2.6 million gallons of water from the well is therefore unlikely to affect, and that figure appears in the sort of capsule summary. So I just wanted to get clarification really for the benefit of anybody who might be concerned that that 2.6 million gallon figure is not applicable to the current project's water usage. Thank you. That is correct. The amount is anticipated to be the $655,000. So I think that's a carryover from the original approval, which significantly overestimated how much they would be using. That's what I imagined. Once upon a time, they imagined it might use that much water, but the current estimate is $655,000. I just wanted to clarify that. I have no further questions, and I support the project. Okay, so to be clear...


6:07 p.m.

You're not pulling the project from consent calendar? No need to pull it with that question answered. Okay. Since we're taking these items separately, then I call for a motion on item one on consent calendar. I'll move to approve. So I have a motion. I'll second it. And a second. All those in favor signify by saying aye. Aye. Any opposed or abstain? Hearing none. So now we'll take up item two on the Stroop and Green Diamond General Plan. And Commissioner Fulton is going to excuse himself. I think the thing that Commissioner Fulton you need to do is explain that you are recusing yourself because there is a conflict of interest. And then you could get up and exit the room. Just to make sure.


6:08 p.m.

It's on the record. Sure, yes. I am recusing myself because there is a conflict of interest. I am employed by Green Diamond Resource Company. So item two is the Stroop and Green Diamond general plan amendment zone reclassification and lot line adjustment in the Field Brook area. Commissioners, does anybody want to pull this item? Seeing none, I check in the room. Does anybody want to pull this item from the room? Seeing no hands raised and still nobody on line. Item remains on consent. Call for a motion. I'll make a motion to approve consent item number two, Stroop and Green Diamond general plan amendment. Second.


6:09 p.m.

We have a motion and a second. All those in favor say aye. Aye. Any opposed? None abstained. Okay. Motion passes and that ends the consent calendar. We'll wait for Commissioner Fulton to rejoin and we'll open to public hearing. Thank you. Okay, we move to item F on the agenda, public hearings. And tonight


6:10 p.m.

It appears that all of the items on public hearing tonight are on a common parcel or parcels and share an initial study and mitigate negative declarations. So, Director Ford, are we going to cover this with one staff report? We are going to make one presentation for this. And then as Mr. Santos will identify, there is one initial study. So, as part of the first action on the first project, if you're choosing to approve it, it would be to adopt the mitigated negative declaration. The remaining actions do not require re-approval or re-adoption of the initial study. You should identify that you have considered. The initial study and found it adequate and we will moderate.


6:11 p.m.

the resolution to include that language. Okay. And we will have to approve the conditional use permits on each separate project. Yeah. They really require separate actions because they are separate permits. Correct. Okay. Thank you. With that clarification, we'll turn it over to staff. Good evening, Commissioners, Chair Skavdal. My name is Stephen Santos, Senior Planner. I'm presenting these projects. We have four applicants and seven permits on one legal parcel comprised of three APNs. So it sounds like a lot to wrap our minds around, but it's actually, as we go through the various components, pretty routine. Sorry. We have a question. Interrupt. Six permits, not seven. Seven. Seven. Seven. Six. Six. Six. Six. Six. Six. Six. Six. Six. Six. Six. Six. Six. Six. Seven. Six. Six. Six. Six. Six.


6:12 p.m.

One conditional use permit per project, and then one of the projects also has a special permit for restoration work. Thank you. Okay. There we go. All right, my screen advanced. I'm just waiting for, there we go. So the project area is in the Larrabee Valley, east of Bridgeville. It takes access from Highway 36. We got to lag a little bit. It's an 812-acre parcel, legal parcel, comprised of three APNs. It's got mixed land use designations and zoning. It's got an agricultural grazing and tea timberland land use designation. It also has an agricultural exclusive and TPC. zoning.


6:13 p.m.

All of the proposed projects tonight take place in the AGAE portions of the parcel. So first I'm going to summarize the overall project from a secret perspective. It's everything combined. We have approximately 56,000 square feet of existing outdoor commercial cannabis and four acres of new outdoor commercial cannabis proposed. Total estimated annual water is 4.6 million gallons sourced from three existing ponds and one proposed rainwater catchment pond as well as five existing and permitted groundwater wells. All of the wells were evaluated by a geologist and who determined that they're all hydrologically disconnected. The overall water storage consists of 4.3 million


6:14 p.m.

gallons in ponds and an additional 402,000 gallons in existing and proposed hard tanks. Processing on-site, including trimming and packaging, is proposed for the existing cultivation and processing off-site at a licensed facility is proposed for the new cultivation. Power is to be provided by a combination of solar and PG&E with generators reserved for emergency backup only. The sites and parcels that are along Highway 36 are served with PG&E. The project includes, one of the projects includes on-site relocation, and so a special permit is also included for restoration within stream site management areas. This graphic, the labels do not indicate where the activities are actually taking place. They're just to show the distribution. The distribution of the projects across the three parcels.


6:15 p.m.

For shorthand, you'll hear me refer to Western parcel 7, Northern parcel 8, Southern parcel 1 as we go along on this journey today. As you may notice from this already, the two existing cultivation projects on parcel 7 and parcel 8 are being processed under the CCLUO or 2.0, whereas the projects for new cultivation are being processed under 1.0. In anticipation of the question of why that is, the reason is because the CMMLUO limits the amount of existing cultivation on a single legal parcel to one acre, whereas 2.0 allows 100% of the pre-existing cultivation. So it made sense for the applicants to process those two under 2.0 to allow them their 100% of what their existing was. Thank you. So this next


6:16 p.m.

The next segment of the presentation is going to go over the environmental document, but pretty much limit to the mitigation monitoring reporting program in summary fashion. Mitigations are proposed related to the six topic areas on the screen, agricultural and forestry resources, air quality, biological resources, cultural resources, noise, and tribal cultural resources. And we'll go through them one by one. The first one is agricultural and forestry resources. There was some timber conversion on that northern parcel, parcel 8, in conjunction with the existing cultivation application 12998. And it basically focuses on implementing the less than three acre conversion mitigation plan, which is in appendix 8 of the ISMND, which describes four sites that need attention. And you can see, basically,


6:17 p.m.

Basically what the summary is, removing pond outlets, removing debris, pulling back gardens, rocking outlet access, things like that. The applicant has been very proactive and been giving regular reports to the county. Most, if not all, of this work has already been done. We're just waiting for an implementation report from an RFP. So this mitigation measure only applies to that northern parcel. The next topic is air quality. This is a pretty standard mitigation that we see in initial studies, just having to do with dust that can get generated during construction. This will most likely be relevant during the excavation of the new rainwater catchment pond on the southern parcel, Parcel 1, but it would apply to any dust-generating construction that may occur in association with the project. Typical measures to mitigate. To...


6:18 p.m.

you know, water the ground, to limit construction when there's high winds, things like that. On the topic of biological resources, we have four mitigation measures. The first one has to do with nesting bird surveys. So if any project-related construction needs to happen between February 1st or August 31st, there needs to be a nesting bird survey performed by a qualified biologist. And the outcomes of that survey are pretty standard, where the biologist will designate a particular buffer area based on that species type and the type of disturbance it might be sensitive to, but construction activities would still be allowed outside those buffer areas. Mitigation measure number two under biological resources just has to do with nesting bird surveys.


6:19 p.m.

to do with bullfrog management. This also aligns with the one comment we received from CDFW, one referral comment, and that just has to do with making sure to manage the ponds so bullfrogs don't establish. Again, this is an area in which the applicants have been very proactive. Bullfrog management plans have already been developed and were part of the attachments in the project packages. Mitigation number BR3 has to do with invasive plant management, restoration, and monitoring. This will be in place for the life of the project. Again, standard approach. Areas need to be monitored a couple of times a year for certain species. Only native grass seed can be used for remediation sites. Bare soil should be covered with straw. Very routine. Kind of measure and an invasive plant management, restoration, and monitoring.


6:20 p.m.

and has already been developed by the applicants and is part of the project materials. The final biological mitigation is generator sound attenuation, and this is to ensure that the use of generators comply with various standards. And these are standard conditions of approval anyway that show up in the projects, such as not exceeding 50 decibels at 100 feet over a forest edge, whichever is closer, or not exceeding 3 decibels above ambient noise levels at the property line. So the conditions of approval that are in the various projects accommodate this mitigation measure. We've got two mitigation measures. We've got two measures for cultural resources. The first is the standard inadvertent discussion.


6:21 p.m.

every protocol that we see in every project. I do want to mention that as part of the AB52 consultation process, we sent out notifications to pretty much all the tribes in the region. None of the tribes responded, requesting formal consultation. However, through the project referral process, we had multiple interactions with the Bear River Tipo in particular. There were several site visits. And lots of communication. There were several cultural resource investigations conducted on the property by Nick Angelov, by Bill Rich, some revisits and some supplementation. And part of that was because there are some cultural resources present on the legal parcel. There was a known site known as P12001107. The delineation of that site got updated.


6:22 p.m.

based on these investigations and some additional isolated areas were also identified, WRA 1, 2, and 3. And so as a result of the consultations and the visits with the Bear River Tribal Historic Preservation Officer, or TIPO, the tribe granted a setback reduction. Typically there would be a 600-foot setback, but the tribe agreed that a reduction to 100 feet from the resource boundary was acceptable to them. And we have that in confidential correspondence from them in the department records. And the isolate areas, 1, 2, and 3, can be used. Some of these areas correspond with the existing roads that are on the site. And the TIPO said, these can be used, but they just need to be capped, which means adding six inches of base rock.


6:23 p.m.

And there's an existing barn within one of these resource areas, and the barn itself has been around at least 75 years, based on the photos that I've had access to. It could be even longer, 100 years. And the tribe said they were totally fine with that, and so the barn's been used for agricultural use for quite some time. And the tribe was fine with it to be continued to use for agricultural purposes, such as drying, but no ground disturbance can occur. And so the barn can't be used for trimming, can't be converted to a commercial structure, because that would require ADA parking and a septic, and that would require ground disturbance. But the barn can still be used for drying and other agricultural activities. I'm going to jump ahead. In terms of the farm, I'm going to jump ahead. In terms of alphabetical order, tribal cultural resources, no additional mitigations are proposed there, because the mitigations are exactly the same as in our CR.


6:24 p.m.

on NCR2, an advert and discovery protocol, and then the stuff I just summarized. And the last mitigation relates to noise. And, again, it applies mostly to noise being generated from tools and equipment. And so it sets certain hours of operation and days of operation and just requires that tools and equipment be in good working order. There was no agency or public comment on the ISMND, which is every CEQA practitioner's hope. So I have no comments to respond to with regard to the environmental document. So as Director Ford mentioned, the ISMND only needs to be, adopted once, and then be considered when taking action.


6:25 p.m.

on the individual projects. And so the staff recommendation is that the commission adopt the M&D, the CEQA guidelines, as well as adopt the mitigation and monitoring report. And I'll pause there to see if there's any questions on the segment that I just covered. And I don't know if we should take action at this point or at the end, but I'll pause briefly before continuing. Go ahead, if you have a question. I just have a general question about the wells. So I understand that a geologist said that they were hydrologically disconnected, but one of the most common ways for wells to become disconnected is that they've been overused. And so I'm just kind of wondering, for this permit or this ISM&D but other ones as well, does the county ever pursue that further to see if the disconnection is from overuse versus a natural process?


6:26 p.m.

Because I'm just thinking if it is from overuse, then it's counterproductive to approve more use, right? So as staff, I do not do that kind of analysis. And I can tell you that the geologist, that's not included in the geologist analysis. And so it's been our practice to rely on either engineers or geologists that have expertise in this area in terms of the methodology for coming to their conclusion. So I guess for this project, it might not be applicable, but I guess my recommendation for future would be that the county look into whether or not that is something the geologist can determine when doing their initial study, simply because, again, overpumping an already overpumped well, because you believe it's disconnected, would be counterproductive. So I don't know if that's something in future reviews, but I'm a biologist, not a geologist, so that would take. I would take probably a PE or a PG to do.


6:27 p.m.

I'll let the director respond whether that's something that we could even do, but I would imagine that would require lots of borings and be quite expensive. But, yeah, if we were to adopt that as a standard, that would not be up to me. Okay, and I'll just say, you know, I'll let Director Ford comment, but there was someone in the public that looked like he wanted to comment, but I just want to acknowledge that we saw your hand, and then when we open up to public comment, I would love to hear from you. Yeah, I mean, I'm sure we can look at what the original water level was, depth to water when the well was originally drilled, and ask for a report on what it is now to see whether or not there has been significant drawdown. But I think the point that is being made is that based upon the geology, the depth of the well, the distance of the well, the depth of the well, the depth of the well to other wells, and the distance of the well to stream channels.


6:28 p.m.

or to water bodies, the geologist finds that there would be no connectivity. So they're not doing it based upon whether they did some test to determine whether or not there was water connectivity there. They're looking at the geology, the way the different layers are formed and the slope at which they're at, and where other water bodies or other wells are at. Right. Historically, that was the argument used in the Central Valley, that the wells that were pumped for all this farming were disconnected. And so I would just hate to see the county end up in the same position. But that's a broader comment. I mean, it is extremely dangerous to compare Humboldt County to the Central Valley. Because we do not have one. You bet. It's ubiquitous.


6:29 p.m.

groundwater basin. And so one of the struggles that we've had in dealing with cannabis in general is how to begin to grapple with the fact that our groundwater sources are discontinuous, they're fragmented, they're extremely hard to map, there's only a few actual basins in the county that are acknowledged. And so I understand the idea of over-pumping and the danger of that. But I would also offer that what we're trying to do is look and use a reasonable standard of whether or not proximity, depth of well, elevation of water bodies in the area would cause the ability for it to be able to be pumped. Or to even be connected. Or to pull from that source.


6:30 p.m.

I mean, I can leave it at that for now. It's a broader comment, and then during public comment, we'll hear from the audience. Okay. Yes. Director Fulton, Commissioner Fulton, excuse me. Yeah, I just had a quick question, and I didn't see it within your display there. Is light depth proposed for these grows, and if so, what kind of mitigations do they have in place for the light pollution, if you want to use that term? If an applicant wants to do light deprivation, it's certainly allowed and authorized as part of the entitlement for outdoor, and they must follow the dark sky standards. And so no visible light can be visible either half hour before sunrise or sunset. But as outdoor, there's no artificial light. So the light depth is only depping.


6:31 p.m.

sun. Now there are nurseries, ancillary nurseries associated with these proposals and that's where these dark sky standards would really come into play for this constellation of projects. Thank you. Yes. The letter that came from BLM is associated with this project and I just want to clarify a couple of things. Like the county doesn't allow rodenticides, do they? I do have a slide at the end responding to the BLM letter, but we do prohibit rodenticides that use anticoagulants, anticoagulant-based rodenticides. But you allow them, but just not the ones that... Yeah, and that is based on the recommendations that we get from CDFW where... And then in your presentation, you're going to address the Larrabee Road and Butte Creek Road degradation that they're saying... Yeah, I think that's a good point. I think that's a good point. I think that's a good point. I think that's a good point. I think that's a good point.


6:32 p.m.

are happening from those grows in the area? Through the Chair, yes, Commissioner Neal, the BLM letter that we received yesterday afternoon had four concerns, and I'm going to address all four concerns. Thank you. And just to go back on that, I want to be clear, the mitigated negative declaration that you just went over that was circulated to all public agencies, including the BLM, had no comment. We had received no comments on the NEGDEC. That is correct. No public or agency comments on the NEGDEC. And that circulation included BLM? It did go, yeah, it went to neighbors, and so it would have gone to BLM through that process. And through the clearinghouse. Yeah. The clearinghouse doesn't do, they only...


6:33 p.m.

have check boxes for state agencies. Okay. Yeah. Okay. Thank you. Any other questions of staff at this time? Okay. Please continue. We'll take up the approval of the NGDAC later. Okay. My screen is still shared, so let's go back to the PowerPoint, please. Thank you. Okay. So this next segment of the presentation, I'm going to give individual project summaries structured similarly on how the staff reports were structured. I'm going to do the existing cultivation projects first, and then I'm going to do the new cultivation projects, and then I paired the Jennifer Dunn and the Kelly's Finest projects as well. So I'll be talking about both of those kind of simultaneously when we get to them. Okay. So I'm just going to bring up... I'm going to bring up the graphic I showed earlier a little bit. We're going to start...


6:34 p.m.

Start on the west with natural blue and go clockwise. So here we go. The natural blue project is for approximately 36,000 square feet of existing outdoor cultivation with a 3,600 square foot ancillary nursery. Estimated annual water use is approximately 365,000 gallons per year, which is about 10 gallons per square foot per year. The water sources are rainwater catchment from an existing pond and a permitted groundwater well. As mentioned in the staff report, there's also a spring on this particular parcel. That spring, even though there is a water right to use that spring for irrigation, that spring will not be used for irrigation. It will be used for some domestic uses like hand washing and things like that, but I just wanted to mention.


6:35 p.m.

I mentioned that to the commission that that resource does exist and that's how it's treated in the staff report and the conditions of approval. The pond is about 1.3 million gallons and there's another 42,000 gallons in tanks for storage, so there's plenty of storage. Processing is proposed to occur on site and power is to come from solar with generators reserved for emergencies only. So here is an excerpt from the site plan that shows the overall parcel and the two main activity areas for cultivation. The majority of the operation is snuggled up there towards the western property boundary, but there is a smaller cultivation area more to the center of the parcel. I don't know if you can quite make it out, but I do down towards, let's see if I can use my arrow. Not very well, but that little rectangle right there.


6:36 p.m.

That's his remediation area. That was an area that used to have some bladders, but the applicant has already removed those bladders. And here's just a close-up of the two operational areas, just kind of showing how things are laid out and that they meet all the required setbacks. So it is staff recommendation to find that the Natural Blue project complies with the general plan and zoning policies and recommend approval of the conditional use permit subject to the conditions of approval. So I'm going to, again, take just a brief pause here to see if anyone has questions about the Natural Blue project for existing cultivation. Don Staney. Great. All right, so moving right along. The next project summary is for the northern parcel, parcel 8, four-wheel properties, LLC.


6:37 p.m.

This is for 20,000 square feet of existing outdoor cultivation with a 2,000 square foot ancillary nursery. Water usage is estimated at 440,000 gallons. It is also sourced from an existing rainwater catchment pond and a permitted groundwater well. The pond is about 311,000 gallons, and there's about 70,000 gallons in tanks. Processing is proposed to occur on-site. Power is proposed from PG&E and solar with generators for emergencies only. This is the project that also has some on-site relocation and restoration. There is currently three cultivation areas. All of the cultivation and all of the nursery is going to be consolidated into one single area closer to Highway 36. And...


6:38 p.m.

and more within the curtilage of where there's already a disturbance and existing structures. There's a fourth area that's already been abandoned, so when the remediation happens there will be four total historic areas that get restored, and this is where we've also included a special permit for restoration work within the stream site management area. Here's the site plan showing parcel 8, and I'll do some close-ups in a minute, but the yellow area off to the right, that's the relocation area. That's where everything's going to be consolidated to. Even though I'm going to talk about it at the end, I am going to, since it's already been brought up, talk about the BLM letter a little bit, and that is they were concerned about proximity. The closest cannabis activity to that BLM...


6:39 p.m.

Property boundary is the existing cultivation area where it says C inset B. That cultivation area is about 1,700 feet from the boundary, way past the 600 feet minimum that's required. Once it gets consolidated into the yellow area closer to Highway 36, it'll be about 3,500 feet from that BLM property line. And then here's a close-up of that relocation area. Everything is proposed to occur where we see yellow. The cross-hatched yellow on the right side is going to be the nursery, and then the rest will be cultivation. And then the existing green that you see down at the bottom, that'll be one of the areas that gets restored because that'll get consolidated up into the yellow area as well. So staff is also recommending that you find the four-wheel properties project. That it complies with the recycling management project.


6:40 p.m.

with the general plan and zoning policies and regulations and approve the CUP NSP subject to the conditions of approval. So here I'm going to take another brief pause to see if anyone has questions about four wheel. Thank you through the chair. I want to clarify when reviewing this I thought that the four wheel site was the only site which was allowed for on-site processing but I think on the Gentura site you said there was on-site processing. Great through the chair great question so the when I use the term on-site I'm referring to the legal parcel so natural blue is proposing to process on-site but it will occur it is being proposed to occur within that that area I was just showing on parcel eight so even though natural blue is cultivating on parcel seven he's proposing to process on parcel eight but it's still the same legal parcel so it is on-site. Got it when you are


6:41 p.m.

So I guess maybe that's another, when you say same legal parcel, I thought Natura was on parcel 062 and Four Wheels on parcel 054. So what do you mean by same legal parcel? So there are, I'm going to go back to the screen share please, and then I'm going to go back to this. So we have parcel 7, parcel 8, and parcel 1. These are tax assessor parcels. These three tax assessor parcels comprise one legal parcel. And that's one of the reasons why we're doing everything at once today, and it required an ISMND. So you might hear me slip up and interchangeably say parcel when I mean tax parcel, when I really mean legal parcel. So I apologize for any of that confusion. But getting back to the original question, when I say on-site processing, I'm referring to the totality, which is the legal parcel. Which is? Which is these three taxes.


6:42 p.m.

Thank you. And just to reiterate, so the tax part, the only tax parcel where on-site processing is occurring is the four-wheel tax parcel? Correct. Okay. On-site processing is being proposed on the northern parcel, parcel 8. Any other questions about the four-wheel? Just a quick follow-up. And if you could just clarify or confirm, the reason why only the first two projects, Natura Blue and four-wheels, are going to be able to do on-site processing, as you just described, and not the subsequent applications, is because the rules allow, because of the different ordinance that they're approved under. Is that correct? Through the chair. Yes. No. This.


6:43 p.m.

As part of the applicant's proposal, if the applicant had proposed to do processing on-site for the new cultivation, they could have done that. Oh, okay. The difference is in which ordinance pathway we were going was to accommodate the existing cultivation to make sure all 56,000 square feet could be accommodated. Okay. Well, yes, I guess you answered my question, which was is there some reason why the ones you were going to get to, the third and fourth applications, don't propose on-site processing? It's just a choice of the applicant? That's how it was proposed to us in their operations plan. Okay. Correct. And I'll take just a moment, just for the public and for the commission, that when we use the phrase processing, we're talking about, we're often talking about different. Different things depending on the context. And so there's a continuum of processing, which is a bunch of different tasks that includes like.


6:44 p.m.

and bucking to things like trimming. And so things like drying are still going to occur on site for the new. But once we get into a trimming and packaging scenario, that needs to be done in a different context and a different kind of structure. And so when I say processing on site, I'm referring to processing that includes trimming and packaging. Sure. No, I do understand that. But I'm correct. But, yes, the new cultivation areas are not going to do trimming and packaging on site. That was not proposed. But they could if they wished. That is true. If there were the capacity in that processing facility. That is true. Okay. Thanks. Okay. Any other questions on four-wheel before I move on to the southern parcel one and the new cultivation? Okay.


6:45 p.m.

Thank you. All right, back to the screen share. All right, so the first pairing is the Jennifer Dunn projects. Two acres of new cultivation, 10% ancillary nursery, 1.9 gallons per year. That's total between the two projects. Here is where we have the proposed rainwater catchment pond, but we already have a permitted groundwater well in existence. The proposed pond is to be 2 million gallons, and there's an additional 150,000 gallons in tanks proposed. And so I took the liberty of creating this water distribution diagram that's included in the project materials just to have a visual tool for everybody. And for myself. Just to explain sort of how the water, what the water sources are and where they flow.


6:46 p.m.

So the rectangles on the bottom are the various projects, and then the shapes at the top are the water sources. So we have the wells and the ponds. And so we see that the two Jennifer-done projects, they'll use well two and proposed pond four. And then the numbers indicate approximations of how much water is coming from each source to serve those projects. So I just wanted to put that in a visual format because following it in text can be tricky sometimes. So for the Jennifer-done projects, drawing is proposed on-site with additional processing off-site. Power is proposed to come from PG&E and solar, again, with generators for emergencies only. And here is the cycle. I plan for the southern parcel.


6:47 p.m.

one that shows the layout and this would be a good time to also share with the commission. This is an example of how the applicants have been proactive and the project has evolved and been amended to accommodate the various studies and conclusions because at one point a total of five acres was proposed for this parcel but once the studies and all the delineations kind of came through it made more sense to bring that down to four acres just to make sure that everything was fitting and sufficiently set back from the aquatic resources and the other resources. And this is just a close up on the future alignment of most of the greenhouses once they're constructed. So staff is recommending to the commission. That for the Jennifer Dunn projects that you find the projects comply with the general plan and the zoning regulation.


6:48 p.m.

and approve the two conditional use permits subject to the conditions of approval. So I'm going to actually just keep on going because these two pairings are kind of cookie-cutter a little bit. And so we have the Cali's finest projects. Again, two acres of new, 10% nursery, same amount of water per year. And then we'll go back to the diagram. The real difference between Cali's and Jennifer Dunn is how the water shakes out. So we see that Cali's finest relies on two ponds and two wells versus the one well, one pond. But all the math does add up. And then same as before, drawing on site, additional processing off site, power from PG&E with generators, and solar with generators. For emergencies only.


6:49 p.m.

And then, yep, we've already reviewed this site plan, so it's the same layout. So staff is recommending approval of these two projects as well. And so before I get into addressing the public comment from BLM, I'll pause and see if there's any questions on parcel one. Thank you. Commissioner Chiazzi has a question. Through the chair, can you clarify again why they're broken up into one-acre permits? So we have two one-acre permits for Dunn and two one-acre permits for Cali. Why they weren't just a single two-acre permit? Well, the way the regulations are is you are allowed up to one acre with a conditional use permit. And if your parcel meets certain zoning... ...zoning requirements and size thresholds, you can get an additional acre. So the first thing that needs...


6:50 p.m.

What happens is your parcel needs to be at least 320 acres. And then for every 100-acre increment above 320, you can get one more acre. And so that's why it's kind of broken down that way. So with each acre, there's a conditional use permit to go with that. And it also makes sense because it allows the operator and the applicant or permit holder to possibly transfer one of those permits or lease one of those out. And then they can be managed independently, inspected independently, and things like that. Because if they're all joined together but one operation is found to be out of compliance, that could make the one that is in compliance go a little bit further. So that's another reason why it makes sense to kind of keep them structured this way.


6:51 p.m.

Any other questions on the southern parcel, parcel one? I don't think so. Please continue. Thank you. All right. Let's go back. So yesterday we did receive this public comment letter from the Bureau of Land Management, and there were four items, concerns, requests within that letter. They asked for a parcel boundary survey. They expressed concerns regarding proximity to northern spotted owl habitat, NSO habitat. They expressed concerns about maintenance and damage to their access easements, and they also mentioned, reminded the county that cannabis is prohibited under the Federal Controlled Substances Act. So I just wanted to show the commission where that BLM property is in relationship to the comment letter. It's up there in the northwestern, and it touches along the corner. Thank you.


6:52 p.m.

And so staff response to each of the items listed in the letter, and I mentioned this as I was going through the presentation, that current cultivation operations are already 1,700 feet away from that boundary. Once they're relocated, they'll be even further away. No boundary survey is needed to ensure that the cannabis activities aren't trespassing on BLM lands. Moving on to their second item, concern regarding proximity to NSO habitat. NSO surveys were conducted as part of the studies done for this ISMND, and there were negative sightings. And. And the conditions of approval include standards for noise and light and rodenticide and runoff management, which were the concerns mentioned in the letter.


6:53 p.m.

letter in terms of what are the potential threats to the NSO habitat. And so all of those are already baked in, as all of you know, into the cannabis program and into the conditions of approval. And finally, the projects are sufficiently set back from the BLM lands as well as the activity centers that are mapped within various mapping resources. With regard to the access easements, the projects take access exclusively from State Highway 36 and roads internal to the legal parcel. So there's no concern that there's going to be any damage to the BLM easements or the BLM roads because they're not going to be used at all. And with regard to the reference to the Controlled Substances Act, no cultivation, no facilities, no access of transportation occurs on or through. Federal lands. So we don't even need to put an informational note in the .


6:54 p.m.

approval regarding the Controlled Substances Act. So that's not an issue. So the comments that we received from BLM were pretty standard. Whenever we get a comment, a letter from BLM, it looks a lot like the one we just got. And so the good news is, you know, we already address these types of concerns as part of our implementation of the program. So I made recommendations going along the way, and so I'm going to kind of then try and combine them all now in these final slides, recommending that the commission adopt the MND per CEQA guidelines, adopt it once, and adopt the mitigation monitoring report. Once adopted, ask the commission to consider it as it finds that the natural blue four-wheel, Jennifer Dunn, and Cali's finest projects comply with the general plan and zoning policies and regulations.


6:55 p.m.

regulations and staff is recommending that the commission approve the natural blue CUP approve the four wheel property CUP and SP approve the Jennifer Dunn CUPs approve the Cali's finest CUPs all subject to the recommended conditions of approval. And that brings us to the end of the presentation and both both applicants are present in the room today and are available for questions. Eric Sordle is the applicant for four wheel properties and Cali's finest. He's also the authorized agent for Jennifer Dunn. And then John is the applicant for natural blue. OK. Yeah we have a couple of the questions of staff before. Is that OK John. Yeah I'd like to just clarify something though. The mitigation. Marge.


6:56 p.m.

The reporting plan does need to be adopted for each of the projects. Don't just adopt it once. That needs to be adopted by each of the projects. Okay. And then as part of one of the projects, go ahead and adopt the resolution that adopts the negative declaration. And then subsequently the resolution should be changed that the commission has found that ISM&D, you've considered it, and it adequately addresses the potentially significant environmental effects. Okay. So I know we have a couple questions from commissioners, but before we go there, just in terms of logistics, I'm assuming I'm going to open a public hearing. Yes. For each one of these items and take comment on each one and adopt the resolutions on those, or we can have two applicants. You can open the public hearing for all four.


6:57 p.m.

them right now okay but then when you do a motion the motion needs to be specific to each of the permits okay i need to get you know when i open the public hearing i want to give applicant time to speak yeah there's four of them yep if i give them each 10 minutes we could be here for a little while but um but i think that's that's the that's appropriate approach right yeah okay so before we do that um commissioners any questions of staff and i have two i think commissioner fulton yes you i think you were first so all right i just do i have a simple question it's uh i think it will address the the department of the interior's letter in regards to the nso surveys were those done excuse me in the in the nso surveys were those done in the nso surveys were those done in the exclusively on the property seeking the conditional use permit and did they take


6:58 p.m.

into account neighboring landowner surveys? I don't know the answer to that question, but Eric might. My recollection of the mapping of the call stations for the NSO, as I pull up the data sheets in my head, but we could maybe bring them up on the computer, is that they all took place on the legal parcel, the call stations. So Chris Carroll, I work with Chris Carroll. Can you just hold that until we open a public hearing, please? I apologize. Please don't. I apologize. That's okay. You can say that you don't have the answer and refer to the applicant, but we'll wait until I open a public hearing for the applicant. Commissioner Chiazzi? Can you throw up your second to last slide? I'm still a little bit tripped up. I'm still a little bit tripped up on this special permit.


6:59 p.m.

The second to last slide, you summarized what the ask is, and then your last slide also summarized what the ask is. I don't know if you could bring that up again. I think Cliff's working on that right now. Thank you. So, yeah, with regard to the four-wheel properties application, yeah, we have a conditional use permit and a special permit. But, yeah, so you wanted the recommendation slide? Yeah, the last two slides, please. Okay, is this shared? Okay. Okay, so there's, there was that slide which was clarified by the director. And then the slide.


7 p.m.

After it, the second bullet is the four-wheel properties where the CUP and the SP are mentioned. Okay, and then can you go back to the previous slide one more time, please? Okay, thank you. I appreciate it. Okay, I think we'll just take a five-minute break, so we'll come back at five after the hour. And when we come back, we'll open a public hearing. Thank you.


7:05 p.m.

Thank you. Thank you. I call the meeting back to order. And we're now going to take public comment. And I'm going to pull this all together. So we'll take public comment on any or all of the...


7:06 p.m.

projects that we just heard the staff report on and the mitigated negative declaration. So we'll take a public comment and when it's your time to speak, you can speak on any or all of the above. And then we'll close the public comment period and take action following public comment. So and feel free to address any questions that you heard from the commission or provide any additional information that you think would be of value to us. And feel free to comment on any of the projects with the understanding and noting that we just had a great and detailed staff report on mitigated negative and the individual projects. So with that, I'll open a public hearing. And the applicant. If there's an applicant or the applicant's agent that would like to address the commission, please do so. And you have up to 10 minutes.


7:07 p.m.

My name is Eric Sordall. I have the Cali's Finest and Four Wheel Properties. My wife is Jennifer Dunn, so I represent her too. I just wanted to clarify the well issue. When we did the hydrologic studies, before we were able to use those wells, we had to get that study done. So it wasn't, the wells weren't pumped or over-pumped. They were never used until that report was done. And exactly kind of how Mr. Ford was saying with the geology of the well drillings and the different layers that the well report said in the well report, everything like from how far the creek or how far, you know, certain stones and geology, that all goes into that report. But I just wanted to really make sure, you know, that you knew that it wasn't over-pumped and it wasn't used prior to.


7:08 p.m.

That report being done. And then I think there was another comment, another question. No? The NSO thing, but I think you guys found an updated map. And we did a THP, so Chris Carroll does take the surrounding owl calls, and if there was a hit, then that would have changed our THP from the get-go. There was no hits in that area, and then on site with our own NSO calling, there was no hits. Thank you. Any other questions? Yes? Just so I understand, the well report was done prior to using the wells, initially, right? The WCR, which is the well...


7:09 p.m.

Completion report gets done as soon as they drill the well, and then they get to see the different layers of sediment going through there, and then the geologist comes through and puts it all together, how far it's away from the next well, how far it is from a certain stream, or I don't remember if it was class one, class two, class three stream, how far it is elevation, wetland, if there's a wetland in the area, that comes into account. So there's like a bunch of things that kind of compile before he makes his determination. But that's for the initial well. So then I guess my question might actually be to staff then, when you're authorizing use of an existing well for additional draw, is it the same? An initial report that's used, or is there some sort of analysis for the carrying?


7:10 p.m.

capacity of the additional draw. Does that make sense? So there was no existing before this kind of thing? Oh, okay. They were coming online as this well was going with this permit, this well was going with another permit. Okay, I read one of them as existing. Okay, gotcha. Any other questions of the applicant? Okay, thank you. Thank you. So that, excuse me, anybody else would like to address the commission on any other projects or the NGDAC? I can't see if there's anybody online Director Ford? No? Okay. Then I'm going to close the public hearing. Thank you for your comments and bring them back to the commissioner. Thank you for discussion and decisions.


7:11 p.m.

And if we need any additional discussion, and if not, I think Commissioner Ford is going to help propose a resolution for us or a motion for us. Director, excuse me, Commissioner Curiazzi. Got a lot of directors out there. I'm going to give us all a raise. Going back to the comment from BLM around Larrabee Road, it wasn't clear to me in the staff reports that until this, or it wasn't clear to me in the reports until tonight, and the report given by staff, that Larrabee was not used at all. I'm wondering if it would make sense to add a condition stating that those roads cannot be used. As access for this property. Just to clarify and solidify that, what BLM.


7:12 p.m.

brought up. Certainly within the commission's purview to do that, but I'm not even sure there's connectivity from that access to the property. So I don't know if that condition would even be necessary, honestly. I'm a little concerned about that. I mean, they are public roads. Commissioner? My question is, I mean, if it's Larrabee Road and China Mine Road, those are not owned by BLM, correct? They just have an easement to use them like everybody else, correct? That is my understanding, but I can't confirm it with absolute certainty. I can clarify if needed on that. Please do. So the, where, if you could come up. Yeah, come up to the podium, please. The Butte Road is actually probably two miles down the road to access, and then you would get on that road from the highway and hightail.


7:13 p.m.

up the Butte, but there is no direct access off-road from my ranch on to the Butte Road. The China Mine, there's no public access through there. There's no BLM on the China Mine. It would be the very next road after China Mine, which is quite a bit. So neither road is accessible from the ranch without going out onto the highway and going down either side, but either one is miles down the road, and there's no reason for me or any of the applicants to use those roads whatsoever. I've never even been down either one of those roads ever. Thank you. Yeah, thank you. I think with the clarification that they are public county roads, I think BLM... BLM's comment did hint at possible soil deliveries, but it sounds like this applicant is not responsible for those if that's the...


7:14 p.m.

case so I'm okay with not adding a condition. Any other questions of commissioners or any discussion? Director Ford have you crafted a motion for us to consider? I have and I'm trying to share my screen screen. I guess while we're, if I could do one more comment. Sure. I just want to acknowledge again that the NSO comment from BLM and that, yeah, I feel like staff addressed that. And also it meets CDFW requirements. They didn't comment on it. So, yeah, I'm comfortable not taking action on that as well. Thank you.


7:15 p.m.

Thank you. Okay, if you're ready. So the recommendation for the... Sorry, I just lost what I was looking at. It's still being shared. So the motion for Natura Blue would remain the same. And then for four-wheel properties for Jennifer Dunn and for Kelly's Finest, the recommendation would just change slightly, which would be to adopt the resolution, which does the following, to modify the resolution to include a finding that the Planning Commission has 생각ado que sería muy labioso para sust 1080 de julio, al menosgramd Peroch de تم 투 a la verdadera represent�ra. La idea voltθis is not cinesh roommate disease, for there is no International Law on thisçasции Cuatro drie Hamburg i Mat Graphene y Cla McCree Jennerquiak e Ceri


7:16 p.m.

Considered the mitigated negative declaration listing the state clearinghouse number and it adequately addresses the potential environmental effects of the project and the project is within the scope of the mitigated negative declaration. That would be repeated for each of the three subsequent projects. I just added some language there that I didn't add to all the others, but that would be the motion. You could make the motion to adopt Natura Blue, adopt the mitigated negative declaration, or adopt the resolution to adopt the mitigated negative declaration. Find the project complies with the general plan. And that's it. And zoning ordinance. Approve the Natura Blue.


7:17 p.m.

conditional use permit subject to the conditions of approval and adopt the mitigation monitoring reporting plan and then just continue to make motions for each of them you could make the same motion to adopt the resolutions for four-wheel properties for Cali's finest and for the general done application to modify the resolution to include that the Planning Commission that finds and has considered the mitigated negative declaration that it adequately addresses the potential environmental effects of the project and the project is within the scope of the mitigated negative declaration finds the project's comply with an General Plan in the zoning ordinance approves the four-wheel properties LLC conditional use permit subject to the conditions of approval you can find the interactive action plan on the right-hand corner of the table


7:18 p.m.

And adopts the mitigation monitoring reporting plan. Looks like we have some questions. So just to make sure I understand, you are proposing that we do four separate motions, and the first one has the language that you suggested for Natura, and then the second, third, and fourth motion all essentially repeat each other but insert that applicant? And I'm fine with you making a motion to do what has just been put on the screen. Great. Correct. Commissioner Kierhase. Just to clarify that four wheels also has the special permit language added to it, which the other two do not. That is true. In which case, I'll make a motion for item F1.


7:19 p.m.

With the language as proposed on the screen. I have a motion. I'll second that. Second from Commissioner O'Neill. And we'll, I think we can just use a voice vote on these. All those in favor can say aye. Aye. Any opposed or abstain? None. Okay. Okay. I'll make a motion to approve item F2 with the language as proposed on the screen. I have a motion. I believe this one also has the special permit associated with it. And that was part of the proposed language, right? Yes. Okay. So we're good. Motion from Commissioner McFarland. I'll second it. Second from Commissioner O'Neill. All those in favor? Aye. Aye. Any opposed or abstained?


7:20 p.m.

Hearing none. Okay. Item F3. Seeing no one else jumping forward, I'll make a motion to approve item F3 with the languages proposed on the screen. I'll second it. I have a motion from Commissioner McFarland, second from Commissioner O'Neill. All those in favor, say aye. Aye. Any opposed or abstained? No. Okay. And I'll make a final motion to approve item F4 with the languages proposed on the screen. I'll second that. So I have a motion from Commissioner McFarland again and a second from Commissioner O'Neill. All those in favor, say aye. Aye. Any opposed or abstained? None. Thank you. Thank you, staff. That was a relatively complicated project that you brought together for us. Very straightforward. So thank you. Thank you. Yes. Thank you to the applicant, too. Second that. Thank you.


7:21 p.m.

All right, so we'll move forward. We have no items pulled from consent this evening. Director Ford, do we have a report? Yes, just bring a couple things up really briefly. One, the Board of Supervisors adopted the employee housing ordinance that the Planning Commission had passed on. And so I know you put a lot of time and effort into that. And I'm not sure if the planner quite finished their presentation before the motion was made. But it's pretty nice to see that amount of work go into something and then have the Board just affirm it like that. The Regional Climate Action Plan. There are discussions about where the Regional Climate Committee should go. It was at HCOG today to...


7:22 p.m.

For them to consider whether they wanted to be the Regional Climate Committee, they're interested in it, but there's some other movement within the community to explore the possibility of the Redwood Coast Energy Authority performing that task. And so the RCEA is going to consider that next week. And so we'll stay tuned on that. And then I think the other thing that I wanted to apologize for is that we should have had the elections for chair and vice chair today, and I didn't get that done, so I apologize for that. We will do that at our next meeting, which will be the second meeting in February. We don't have any items. We're the first meeting. When we do that, would you like to say anything? Thank you.


7:23 p.m.

Thank you. We could hold the elections at the beginning of the meeting or the end of the meeting, I suppose. We'll do it right up front. Yeah. However, is that not the meeting, the period in which Commissioner West will be absent? I believe it's Commissioner McFarland that is up for reappointment. Oh, okay. And I believe the board is going to do that on the 27th. Of which month? Of January. Oh, okay. So in which case we will know who our full commission is by the time we get to that next meeting. Correct. Okay. Yeah, I feel like that was such a great thing that the clerk of the board decided to put out the notice before the term ended. Yeah. What a concept. That's what I was worried about. Yeah. One other thing.


7:24 p.m.

Another item I noticed that the board has been discussing or in negotiations with is which is over the courtroom security. Yes. And I don't know where that's headed, but it seems like they're still in negotiations perhaps on that. But I think the commission needs to be made aware, and if we have some concerns, we might want to express those to the board if we have them. If you would like to, I don't know that that's an item that has to be agendized, but if you want me to pass along a letter or have a letter for your signature. I don't know if all the commissioners are aware of the potential situation, so maybe you can explain what's going on. Sure, I'd be happy to. Yeah. So one of the ironies in this is that the screening that occurs at this entrance and also the 4th Street entrance. Is something that.


7:25 p.m.

has been available for a while and has been getting paid out of a fund that was created to support the court and support security in the court, support screening. And I think the court recently became aware that they didn't really have that fund, so they couldn't continue to pay for the screening. And so the sheriff brought forward a concern that there's not the budget within the sheriff's department to pay, to continue to pay for that. So it's going to continue on for, I believe, a couple more months, but one of the options is to do away with the security at the doors. There may be security for the courts or screening for the courts on the second front. But there wouldn't be security out here.


7:26 p.m.

I don't want to be alarmist or anything, but I have thought a little bit about what it would be to be sitting in here and have somebody walk into the building that the doors remain unlocked. They have to because it's a public meeting. Right. We can't actually see out there very well. I think it's through May. Yeah. Probably this budget here. This budget here ends June 30th. So, yeah, I think that's what they agreed to. We also have the problem that people just wander in sometimes to get out of the cold and hide out in the building until everybody leaves. Well, you know, the last thing we want to have is people doing exactly that and being in the restrooms when you think you're going to go in there.


7:27 p.m.

have other people. That happens because I've worked in buildings in Old Town and you come to work and somebody's sitting inside there and you didn't know it was there. I would be personally in support of this commission expressing if the commission is in agreement that they're concerned of expressing that in a letter to the supervisors. I think where I'm coming from, it's a concern more of the lack of security and more of an armed person situation. So I guess my question is, if we're asking for security to remain but the funding source doesn't exist, does that mean we're asking the Board of Supervisors to fund it from the general fund or pull it from the general fund? Is it from somewhere else or is it a state grant?


7:28 p.m.

How does that work? Well, I think the first thing to do is to express the concern, so at least the board recognizes the commission's concern. And then the funding reality is something that perhaps gets worked out later, whether it's something that's from the general fund, because obviously the 4th Street side can be locked up, and so that doesn't need to be secured. And perhaps there could be, whether it's private security or, I'll probably get in trouble for saying this, but a sheriff's deputy that's present, that would effectively provide the deterrence from somebody coming in and wandering around the building while the planning commission meeting is going on. Yeah, I think, you know,


7:29 p.m.

We're a little bit unique compared to the board and other public meetings here that we meet in the evening. So I don't know that we need the full metal detector and all of that screening necessarily, but it would be nice to have a presence here. Yeah. Just somebody to check people when they're walking in. Yeah. Yeah, I'll just chime in to agree. Not to be alarmist. But I do think that there is a particular special case of potential vulnerability, either to this meeting or just to the building itself, you know, because of our evening time. So I'm conscious of the budget hard choices, but I would like to add my voice to the suggestion that some sort of letter communicating our concern could be conveyed. Thanks. Is that?


7:30 p.m.

All you need from it. Yeah, I think there's a couple other comments, though. Oh, just out of curiosity, are we the only activity that keeps the courthouse open in the evening? No. Empty? There are other commissions, committees that use the chambers at night. So it's not, I guess it's not unique, but the commission could be voicing a concern that not everybody follows what happens at the board. And so I think the evening meetings is a reasonable concern. Okay. Thank you. Any other? Just. Just procedurally, would you like me to draft this, have it for the next meeting, email it out to everybody?


7:31 p.m.

Give me comments back and I can give it to the chair to sign. I'm fine with email if it's faster more efficient Is it not something that we might want to Agenda is so that it could be commented on by sure when else we'll have it on the next meeting Just so the article that I read From one of our local news publications so that the supervisors have already Decided this is that Is there more to be worked out in the details or do you think there's an opportunity for reconsideration or am I? Am I miss reading the headline? well, I think that they're Not already have decided strongly leaning towards stopping the the scanning at the entrances But that doesn't mean that there aren't others any specific You


7:32 p.m.

security issues that should be contemplated. Got it. That's helpful. Thank you. No. And I don't think it's just our security or the guests that are here during our meetings, but it would extend to, you know, using the opportunity of this meeting to gain access and could provide issues for staff coming in in the morning. And that's what I found. People will come into the building, hide out for the night, and then they're there when you come to work in the morning. So it's not just our security, our guests, but using this meeting as an opportunity to gain access. No, thank you for saying that. One of the things that I haven't asked this yet, I haven't really articulated this yet, but like tonight, who's going to lock this place up? Right now it's the guard. Correct. If I may ask, are they planning on just canceling the screening, no longer running that portion? No. Still running the security or is that still up in the air? Thank you.


7:33 p.m.

I can't see them walking away from this building with no security whatsoever. The discussion with the board, primarily, frankly, related to the board meeting, was that there's a panic button right here. And, you know, since the sheriff's just right downstairs, it doesn't take long for a sheriff to get up here. No, but it does. I've worked for the sheriff's office, and quite often at night, that place is empty because we're out on the street. And you're within the city of Eureka. Well, then I think that that is just probably another thought that really wasn't presented as part of that discussion and should be considered. And I presume this building would then be locked at 5 o'clock. So, I don't know, do you have keys? Do you access this building now, or is it open when we get here? It's open when we get here. I don't have keys to this building. So...


7:34 p.m.

Do they still release prisoners after hours? Oh, yeah. Because that was an issue with the church, that when they had that one incident there, that if people get out and they don't have anywhere to go, they can wander around the building, I guess. I guess, what did we do 20 years ago before we had screening? People were nicer. Point taken. That was a point of discussion at the board that 20 years ago there wasn't screening and we were able to survive. But on the other hand, I think Commissioner O'Neill's point is well taken. Times have changed. Yeah. Okay. Thank you. Are there any other planning commission discussion items? This evening? Can I just ask a non-security question?


7:35 p.m.

So printed on the agenda is that our next meeting is February 5th, but it's actually the 19th, correct? That is correct. Cool. And then I was just wondering, for the sake of our new commissioner, do we have any large ordinances or programmatic approaches coming down the pipeline? Always. The next big thing that the commission will probably see is we are currently working on an amendment to the Humboldt Bay Area Plan. And then we're going to be working on addressing the zoning that was almost adopted to implement the general plan. But was pulled back. And then we'll be trying to start on at least one community plan, probably starting in Glendale. So, yeah.


7:36 p.m.

There's a lot that we're working on. I wanted to say, too, that maybe this is more than I should, but we've been working on a project down in King Salmon to do a feasibility study to determine if it's possible to do some things to resist first nuisance flooding and then even sea level rise. Then the combination of the recent king tide and the heavy rains really resulted in some severe flooding down there. And so it's like it's really actually changed our approach to how we're looking at it. It's not just a nuisance anymore. It's here. And then just to also say we were in partnership with Cal, Pauley.


7:37 p.m.

and some graduate students there. And those graduate students went out on the street and worked with the community and organized them and organized resources and did tremendous work. And so we often talk about trying to be resilient. And to me, you could almost write a book on what they did about what resilience looks like. So I just wanted to call that out. That was, you don't expect all the time college students to be that ingenious, but they did some tremendous work. Good. Thank you. Oh, one other thing. I saw you had a public hearing on a project for a cell tower up in the Sunnybrae area. I don't know if that project will ever make it to us, but if it does.


7:38 p.m.

Because I think you'll have to include the recorded meeting because it was out on social media and we saw it, some of us. Thanks for doing that meeting. Hopefully you had it off something, but we'll see if it gets there. That was an interesting meeting. Yeah. Might need security for that item if it comes before us. Yes. Which department was the group of students went to, out of curiosity? The environmental, I forget what the majors actually called. They're grad students. Yeah, it's like the environment and community graduate program, I believe. Yeah. Thanks. I just... It was impressive. Yeah, it was good.


7:39 p.m.

Okay. Any other comments? I just want to remind everybody your Form 700 is coming up. I've tripped myself up on that a couple times, and especially if you're new, if you don't know. Yep. All right. Thanks for that reminder. Meeting adjourned. Thank you.