Humboldt County Planning Commission
Thursday, April 16, 2026
The agenda


6:01 p.m.

Thank you. Thank you. Okay, I'm going to go ahead and call this meeting to order. Can we please salute the flag? The United States of America, to the republic for which it stands, one nation, under God, is the state of America.


6:02 p.m.

God, indivisible, with liberty and justice for all. May we please have a Commissioner roll call? Commissioner Scavdahl? Here. Commissioner Levy is absent. Commissioner O'Neill? Here. Commissioner West? Here. Commissioner Curiazzi is absent. Commissioner McFarlane? Here. Commissioner Fulton? Here. We have a forum. Thank you. Okay, and that brings us to agenda modifications. A note for the public who might be here, there are agendas in the corner if you need to follow along. Okay, so item C, agenda modifications. It looks like tonight the items that usually come last on our agenda, the report from planner and commission discussion items, did not make it onto the agenda. So just a note that we will add those after item G tonight. Thank you. And, Chair, we do have an agenda modification.


6:03 p.m.

We're requesting to remove item E3 from the consent agenda to have that continued to a date uncertain. And then I do just want to note that there is public comments received on items E2, E4, E5, and F1. Thank you. Okay. And with that, we're going to move to public comment on non-agenda items. This is the time in the meeting where folks in the audience or online can speak to the commission about items that are not agendized tonight. So if you are here to talk about something that is on the agenda for the evening, please hold those comments until we open up the comment period for that agenda item. If you have something else that is not agendized that you want to address the commission about, now is your time. I'm going to start with folks in the audience, and I see we have one, so please go ahead. If anybody else is interested in commenting in person, please line up behind her. And you have three minutes.


6:04 p.m.

Good evening, Lori Barnwell, Chalk Mountain Ranch. On February 3rd, Chalk Mountain Ranch participated in a meeting with the planning director Ford and other county staff expressing our concerns about Mercer Frazier's continued use and operations at the Bridgeville Quarry. Chalk Mountain emphasized that without intervention, ongoing activities would result in additional non-compliance and further environmental damages as well as regulatory violations. Chalk Mountain provided public comment regarding the Bridgeville Quarry's lack of permits and submitted a packet of information to the commissioners at their March 19th meeting. Chalk Mountain urged the commissioners to issue a stop work notice to Mercer Frazier until a thorough review of operating guidelines and permit compliance could be conducted. On April 1st, Chalk Mountain Ranch, along with Mercer Frazier Company and Goat Rock Ranch LLC, received another notice of violation from the state water board. The violation is attributed directly to the surface mining activities of Mercer Frazier. Mercer Frazier's ongoing non-compliance with their conditional use permit.


6:05 p.m.

And continued operations without required permits indicates disregard for the county and state regulations as demonstrated by repeated violations. Multiple complaints, including photos and videos, have been submitted to Director Ford and Code Enforcement documenting Mercer Frazier's activities. Despite these efforts, no actions have been taken. The county, serving as the lead agency for the surface mining for the Department of Conservation, has not enforced the SMARA rules and regulations. Additionally, enforcement of state regulations mandating active and approved permits from agencies such as the Water Board, Army Corps, Fish and Wildlife, and Air Quality have not occurred. Mine conditions were inaccurately reported during the last annual county site inspection on November 13, 2024. The inspection report indicated no concerns, yet the state Water Board had documented violations just one month prior. The inspection report did not include details regarding the reclamation plan. In contrast, the state Water Board did not include details regarding the reclamation plan.


6:06 p.m.

Presented last month. The bridge will recognition plan lacks clarity and completeness. Noncompliance by Mercer Frazier and the county's lack of enforcement of regulation remains an ongoing issue and is unacceptable. Once again, chalk mountain urges that Mercer Frazier Bridge will quarry activities are suspended until all required permits are secured and compliance is demonstrated with the appropriate regulatory authorities. I have another document packet for your review this evening and I'd be happy to answer any questions. Thank you. Okay and as a reminder for folks who may want to make public comment online or on the phone, please raise your hand now. To raise your hand on the phone, please press star nine. And while we're waiting to see if anybody does that, anybody else in the room like to make public comment on non-agendized items? Okay seeing none and I'm not seeing any hands raised online. We're going to go ahead and close public comment and move on to the consent agenda item E.


6:07 p.m.

So with the consent agenda, typically what we do is we will take them all as one vote. But before we do that, we will read out all of the items on the list of the consent agenda and see if anybody on the commission or anybody in the room or online would like to have that item pulled for a full discussion. So if you were in the audience or online and would like to see this item pulled, please raise your hand. And I'm going to read them off one by one. So first we have item E1, the review and approval of the March 19th, 2026 action summary. Does anybody want that pulled? I'm seeing a hand pulled online for this one by Webster. And I'm not sure if they wanted all of the items pulled or a different item pulled or this item specifically. If you want a different item besides this one pulled, please unraise your hand and raise it again when I read that item. But if you want this item pulled, please keep your hand.


6:08 p.m.

raised okay they got their hand raised so the action item will stay well will be removed from consent item e2 dane valadeo subdivision extension would anybody like to pull this item Okay, I'm not seeing anybody raise their hand for this one either in the room or online We received quite a robust bit of public comment from this So as a reminder if you want this item pulled, please raise your hand for a discussion Otherwise, we're gonna take one vote as a grouping for it. Okay, great Item three Humboldt farm LLC Anybody on the Commission like to pull this item? We'll pull to make a separate vote that I'm being continued


6:09 p.m.

Yeah, item E3 will be removed for a date uncertain. Thank you. Okay, item E4. Oh, just to clarify, I do not see any hands raised in the audience or online for item E3. Item E4 is the Peli Parcels Map Subdivision. We received some public comment for this item. Anybody on the commission like to pull this item? Anybody in the audience or online? Okay, seeing none, I'm going to move on. Item E5 is the Westfall Agricultural Preserve General Plan Amendment and Zone Reclassification. Anybody on the commission like to pull this item? Okay, seeing none. Anybody online or in the room? I'm seeing none. Okay, so that leaves us with items E1.


6:10 p.m.

E2, E4, and E5 on the consent agenda. Item E3 has been pulled from the consent agenda and will be heard directly after this item. Oh, thank you. Chair, could I please ask that you confirm with the caller that has their hand raised? They are, yes. For item E1? Yeah. Okay. Which item actually their hand is raised for, just to make sure, before I approve the consent calendar. Okay. That's a great point. Okay. Caller Webster, you would believe you were the one who had your hand raised initially. Please go ahead and unmute with star six and let us know if you did indeed mean to raise your hand for item E1, the minutes. Hello. Hi, can you, at this time we're not asking for comment yet, but...


6:11 p.m.

You can just confirm that you raised your hand to have the minutes item E1 pulled from consent. Can you hear me now? Caller Webster, can you hear me? Oh, there we are. Hello. Hi. Right now we're not quite ready for public comment yet. We are just asking to confirm with you whether or not you had your hand raised to pull item E1 from consent to make sure that was the item that you wanted pulled. No, I just had a general public comment. Oh, I'm sorry. The time for public comment has already passed for this evening. Okay. I will go ahead and submit it via email then. Okay. Thank you. I apologize about that. Yeah. Thank you. And thank you for confirming. Okay. With that, thank you for the suggestion of a second confirmation. We are going to go ahead and retain E1 on the consent. Thank you.


6:12 p.m.

E1, E2, E4, and E5 are being considered for the consent calendar, and E3 is the item that is pulled for consideration separate after this. I'll go ahead and make a motion to approve the consent calendar items E1, E2, E4, and E5. I'll second. All right. May we please have a voice vote? All those in favor, say aye. Aye. Aye. Aye. Anybody against? Okay. Motion carries. I'll move to continue item E3, Humboldt Farm, LLC, to a date uncertain. Thank you. I'll second. Okay. I heard a second from Commissioner O'Neill. Let's do another voice vote. All those in favor, please say aye. Aye. Aye.


6:13 p.m.

Any opposed? Motion carries. All right. And that brings us, that was item F, items pulled from consent, and that brings us to item G, public hearings. We have one item on the public hearing docket tonight, and this is Plant Humble LLC special permit. And I just want to note for commissioners that we did receive one comment from the applicant that's on your packet. And with that, staff, please take it away. Good evening, Chair West, members of the Commission. My name is Stephen Santos, Senior Planner, presenting the Plant Humboldt Project, re-presenting the Plant Humboldt Project. I see my PowerPoint is now loaded on the screen. Some of you may recall this matter was brought before the Planning Commission back in...


6:14 p.m.

February, February 19th, we discovered a noticing error after it was heard before the planning commission. So we needed to re-notice the project and then schedule it back before you. So that's why the project is back before you this evening. And so I just want to apologize to the commission and to the applicant for that error before we proceed. The project is a special permit and a rezone. The special permit is for a cannabis nursery as well as a reduction in the streamside management area. And the rezone is from C1 to AG. The project is located in the Bryceland area. And as we zoom in using GIS, we see the project parcel there on the intersection. We see the old Bryceland Road and Bryceland Thorn Road.


6:15 p.m.

And the project parcel is just under three acres. I'm going to give my project summary sort of in two chunks. One is the rezone, and then the other one will be the cannabis permit. As I mentioned in my intro, the zone reclass is from C1 to AG. To do that rezone, three findings need to be made, that the rezone is in the public interest, that it is consistent with the general plan, and that it does not reduce residential density. So I'm going to go through those findings one by one. The property has historically operated as a bamboo nursery, starting back around 2005 for about seven years, and then a cannabis nursery starting in about 2012. Staff believes it is in the public interest to allow the continued operation of the cannabis nursery on a parcel that...


6:16 p.m.

already allows the operation of a non-cannabis nursery. There is a need for cannabis nurseries to support the local cannabis industry. There are cannabis operations in the vicinity, and there would be no impact to roads or adjoining parcels. And the parcel was previously zoned AG, and it was zoned to C1 to facilitate the construction of a mini storage facility. That facility was never constructed. So this proposal essentially is to go back to where we started many years ago as far as the zoning. Next finding, general plan consistency. I want to mention no general plan amendment is requested or needed because the AG zone being proposed is consistent with the RCC, Rural Community Center, use type that applies. And... .


6:17 p.m.

The proposed use is considered general agriculture, which is consistent with the land use tables in the general plan. And it is also consistent with the zoning consistency matrix that's also in table 4H of the general plan, and there's the citation for anyone wanting to look it up. There is no reduction in residential density from this proposal. This site is not part of the residential inventory that was adopted for the housing element. And, in fact, the rezone would make a family dwelling a principally permitted use, which it's not under the current C1 zoning. Though it's not related to what is before the Planning Commission today, I do want to point out there is an unpermitted residence on the structure, and so if this rezone were to be approved, it would make it... it would make it much easier to permit that.


6:18 p.m.

that residence. Moving on to the nursery. We're looking at a special permit for an existing 10,000 square foot wholesale and retail commercial cannabis nursery that uses about 160,000 gallons of water per year that is sourced from a rainwater catchment pond. A rainwater catchment analysis has determined that enough rain can be captured to support the operation. The pond is approximately 250,000 gallons and power to the site is provided by PG&E. This slide is the site plan provided by the applicant and the main purpose of showing the site plan is just to demonstrate that the green polygon down in the southwest corner is where the cannabis is.


6:19 p.m.

This nursery operates. One of the issues for this location is that it is really close to a school bus stop, as well as nearby residential properties. The administrative record includes waivers from the neighbors for those residential setbacks, as well as a waiver from the school district for that bus stop. So all of the setbacks are met through the waivers. And the county and CDFW do support a partial reduction in the streamside management area, and the recommendations from the biologist in the biological assessment are included in the conditions of approval, the recommended conditions of approval. This picture is taken from the biological assessment.


6:20 p.m.

The purple line depicts the general location of where the stream site management area is right now. And the gray line represents what was proposed back on February 19th. And the attachment provided to the commission for today's hearing with the staff recommendation of where the proposed stream site management area would be is slightly to the right of that gray line. Because one of the suggestions the commission made after the last meeting is, why don't you have a site visit so you can be clear on where exactly this line would be? Because, you know, a photograph taken at this altitude, it's kind of hard to tell where the line should be. No public comments were received on the project. But as mentioned, the applicant did.


6:21 p.m.

Provide written comments yesterday. Based on staff review of the document that was provided by the applicant, the concerns associated with the permit fall into these four categories that are on the slide. The stream site management area reduction, the permitting of the pond, recommended removal of bamboo, and prohibition on generator use. So I'm going to go through those four items one by one. Probably the most significant item out of that list of four is the stream site management area. It was the topic of much discussion on February 19th. The applicant is now proposing a complete elimination of the stream site management area and have it reduced all the way to the top of bank. That proposal is not supported by the county and it's not supported by CDFW. CDFW wants all development.


6:22 p.m.

And as far away from the stream as possible. Staff continues to support a reduction from 100 feet to 20 feet, and that is depicted in a photographic exhibit, Attachment 4F, that's part of the staff report, showing some flags on the ground and the immediate surroundings of where the approximate reduced boundary would go. Now, based on the content of the applicant's submittal from yesterday, I want to make it clear that we're not imposing any new restrictions. The streamside management area has been in existence for, you know, quite some time, dating all the way back to the 1985 framework plan. The streamside management area and wetlands ordinance was adopted in 1995 and then reaffirmed in the conference. We've applied those conditions to feathering conservation and open space elements of the 2020 trucking. You can see up in theיכ abdomionts, 37 cases ofrian


6:23 p.m.

2017 general plan what staff is supporting is reducing that setback from a hundred feet down to 20 and I want to make sure the Commission is aware that Redwood Creek is a perennial class one fish-bearing stream in an impact of watershed and so these this reduction from a hundred to twenty feet is extraordinary in of itself and provides based on my two site visits to the property ample room for the cannabis operation you for parking and it takes the unpermitted residents out of the SMA as well.


6:24 p.m.

Thank you. The advocate also objects to the requirement to obtain an after-the-fact grading permit for the pond. The pond was constructed without permits. All cannabis projects with unpermitted grading require after-the-fact grading permits. Grading permits are required by the county's grading ordinance. The commercial cannabis land use ordinance requires compliance agreements and after-the-fact permits for all existing violations associated with the cannabis operation. So the requirement to get an after-the-fact grading permit is not unique to this project. It is standard for all cannabis projects that have non-complying development. The applicant objects to the requirement to remove bamboo from the streamside management area.


6:25 p.m.

Condition of approval A8. The reasons that requirement is in there is because bamboo is an invasive species. CDFW has requested the removal. That's not just in the SMA. It is migrated and propagated into the channel. And removal of the bamboo is also recommended by the applicant's biologist and is in the biological assessment. So that's why it's part of the recommended conditions of approval. And finally, the applicant objects to the prohibition on generator use, condition of approval B4. This requirement in the conditions of approval represents the project as proposed from the applicant. The screenshot included in this slide is from the applicant's operations plan that was provided. To us. And so that's why it says no generator use.


6:26 p.m.

However, I do want to point out to the commission that the planning commission could modify the condition of approval to allow generator use in the case of emergencies, emergencies only, and that would remain consistent with the standards of the commercial cannabis land use ordinance. So that's something that could be done even though it wasn't requested in the project documents. So staff recommendation is for the commission to consider the final EIR adopted for the CCLUO to make the required findings for approval per the Humboldt County Code, to approve the Plant Humboldt LLC special permit subject to the conditions of approval, and this includes reducing the SMA, streamside management area, from 100 feet, to 20 feet, and to reduce the amount of land use that is required for the CCLUO. So that's something that could be done even though it wasn't requested in the project documents. So staff recommendation is for the commission to consider the final EIR adopted for the CCLUO to make the final EIR adopted for the CCLUO, and then recommend the Board of Supervisors approve the rezoning from the Commission.


6:27 p.m.

From C1 to AG. And that concludes my presentation. I'm available for questions. Thank you. Commissioners, do you have questions for staff before we open the public hearing? Yeah, I have a couple. Oh, excuse me. Yeah, go ahead. You said this came back to us because of a noticing issue. When it was here before, all these same conditions, we still had the conditions for the generator, the pond, and the bamboo removal, and the applicant didn't actually comment on those last time. And then... That is correct. Okay. And then my recollection is the... On these... The streamside map... The management area. Last time it was here...


6:28 p.m.

We had the biologist recommendation, which I think was the gray line on your graph, which is, again, the applicant's biologist set that streamside management area prior to the last meeting. In fact, I think that applicant's letter was dated in April, or the biologist's letter for the applicant was dated back in April, so it was months before the last meeting. That is correct. The biological assessment that was considered by the county and CDFW was dated, I believe, May 2025, and included content recommending 20 feet from the top of the bank. And it was at the planning commission meeting, the first time we heard this, where the applicant objected to his own biologist's recommendation and recommended streamside setback area, and it was us, the commission.


6:29 p.m.

that suggested that you meet on site to see if you could possibly reduce that setback from what the applicant's biologist was proposing. Isn't that correct? That is correct. Okay. And absent the noticing issue, we left that in your hands, right? So it would have been up to staff and CDF to agree on that, which is back to what you're proposing to us tonight. That is correct. Okay. Yeah, CDFW was there with me on March 25th on that second site visit. Okay. That's all my questions. Thank you. My question was covered with your SMA question, so. Any other questions? Okay. Okay. Seeing no other questions from the commission, we'll go ahead and open up the public.


6:30 p.m.

Comment period. This is the time where folks can comment on this agenda item. We start with the applicant if they are in the room. I don't see anybody online or by phone at the moment. So if there is an, are you the applicant? No. Okay. So I don't see the applicant in attendance. So then we'll just move on to general public comment. Folks have three minutes. If you would like to make a comment on this item in the room, please approach the podium. If you would like to make a comment online or by phone, please raise your hand. And it is, I never remember off the top of my head, star nine to raise your hand. Okay. I'm not seeing anybody in the room approach the podium. And I'm not seeing anybody in the room. I'm not seeing anybody online period, let alone raising their hand. So we're going to take one more beat just to not rush through public comment. And then we will move on unless somebody appears.


6:31 p.m.

It doesn't look like it. Okay, so we're going to go ahead and close public comment and take it back to the commission for discussion. The only thing that I would have is that I will not waver on the removal of the bamboo. It's an invasive species. If it's already in the stream, it's probably already backing the creek up until that's removed. That's a no-go. And the reduction from 100 to 20 feet, to me, seems a little excessive in reduction size. But if you went out there and you looked, I'm assuming that you felt that 20 feet was acceptable, or were you being accommodating just to try to get this through? I'm not trying to be a trick question, but that seems, I mean, you're removing 80 feet from what was already suggested, correct? We are. When you answer that, can you add in, I think last meeting we had a discussion.


6:32 p.m.

The topography at the there's kind of like a slope right at the 20. Can you add that to your answer to Commissioner Fulton? Certainly through the chair responding to Commissioner Fulton and Commissioner McFarland's combined questions. This site as a whole is flat because it has been graded over time and fill has been added. As I mentioned in my presentation a reduction from 80 to 20 is extraordinary. But one of the things that staff endeavors to do is take into consideration all of the information including the site sites historical use. What its environmental setting is. Historically it is an edge between a small meadow. And, And,


6:33 p.m.

the stream, and then relying on feedback and responses from our trustee agency partners like CDFW. And so they're a good litmus test. If something that is on the margin, they will let us know. They will say, that's a bad idea. So this is really the maximum that is within the comfort zone to accommodate the history of the site, the need to protect the resource, and finding a pathway to allow the continued use of the site, as well as some of the future possible plans like the permitting of the railways. And so there is a bit of balancing that occurs.


6:34 p.m.

The CDFW comment that's in attachment 5 that I shared earlier that CDFW's sensibility is development should be as far away from the stream as possible. And that is a good place to start from when we look at it through the lens of the streamside management area ordinance. But the streamside management area ordinance does allow for a reduction through a special permit when there is a biological assessment that considers the impacts and other other factors. So staff so I use my best judgment based on all of my visits and all of that information of what is the best balance here. And so that was that was the outcome. But yes there was there was a lot of. A lot of pressure to reduce it to zero but that's just not supportable.


6:35 p.m.

So the right boiling that down the primary purpose of the reduction is to potentially allow for the future permitting of the currently unpermitted building. Yes through the lens that the special permit for the stream site management area reduction is its own entitlement. And so part of the consideration of staff is OK. What else what could be developed let's say you know we did reduce it to top of bank what kind of development could be placed not just what is contemplated right now in this moment or what's right there right now. So yes the existence of the unpermitted structure was considered but other principally permitted or permitable. Uses under this zone.


6:36 p.m.

in the proposed zone were also considered in terms of you know how far we should we should go one thing i do want to add as well is that the the size of the parcel is also something that we do take into consideration because this is a smaller parcel than we're used to seeing with cannabis applications so if this was a hundred acre parcel a hundred foot setback is not going to really take up much of the usable space 100 foot setback here i believe would take up you know a significant portion of the applicant's property and so that that's also an important consideration in trying to balance all those issues that mr santos mentioned Any further discussion or motions from the commission? I'll make a motion.


6:37 p.m.

that we adopt the resolution that finds planning commission has considered the final EIR previously adopted for commercial cannabis land use ordinance and the addendum that was prepared for plant Humboldt LLC project finds proposed project complies with the general plan and zoning ordinance finds the proposed project does not reduce residential density for any parcel below the inventory adopted in the housing element and approves the plant Humboldt LLC special permit subject to the conditions of approval as discussed and we recommend the Board of Supervisors approve the rezoning of the parcel from neighborhood commercial to agricultural general I'll go ahead and second that motion. Okay. So we have a motion from Commissioner Scavdahl and a second from myself. Let's go ahead and do a roll call though on this please.


6:38 p.m.

Commissioner Scavdahl. Yes. Commissioner O'Neill. Yes. Commissioner West. Yes. Commissioner McFarlane. Yes. Commissioner Fulton. I just want to confirm that the the three conditions are the removal of the bamboo the setback and what have you. Yeah those all those are all in the conditions as recommended by staff. Yes then that's a yes. Thank you and we do have five to zero vote. Thank you. Okay so that item passes and we will move on to report from planner. Thank you chair. The only thing I really want to mention is that at the last planning commission meeting we did get a request from the commissioners to have a workshop on tsunamis and tsunami hazards and so at our next commission meeting which would be May 7th


6:39 p.m.

We are planning on having representatives from the California Geologic Survey and the National Oceanic and Atmospheric Administration who have been instrumental in developing a lot of that data that we do use. They are planning to attend and give a presentation and be available for questions. So we're excited about that, and then we'll have some other items on that agenda. Wonderful. Thank you. Okay. It looks like that is the full report from the planner. Planning discussion items, or excuse me, commission discussion items, I believe is what we call it. I just had a general comment. I think this is maybe like the third meeting that I've been part of where somebody online raised their hand too late for public comment. And so I don't know. I mean, obviously a lot of times it works out fine. I don't know if there's some way, like in the narrative of the public, but I think there's a comment portion for Dee that we can.


6:40 p.m.

indicate like what to do if you're on the phone like star nine or some i just feel like it's happened a couple times and i just feel bad when it does so i don't know if we can brainstorm a way to help them out i've been thinking about it too i did say for folks to star nine raise their hand and um gave a couple of seconds i think sometimes i agree i hate when we don't get to have the comment that people want to say um so i think i might give a couple more seconds of just sitting and waiting and repeating what i say sometimes it feels like um i'm repeating myself over and over again but i think for the public it's probably helpful to give that space in the past i think noah was uh when he was chair he was pretty good about giving the instructions on how to make a public comment and how to you actually at the very beginning of the meeting so people maybe had more time to process that it's a great idea 550 00 said yes so i taken the advice of anyone who would come to a meeting and had really an honest conversation and really B Mmm of j Site comments and comments and valuable advice on doing people think about. I think. iter going on a way to get left behind along from fence eating and and more constantly processing touted you can't.


6:41 p.m.

There's also, having watched a couple of meetings when I'm not here, there's a pretty good lag between where we think we are in the meeting and where the public, so when you say public comment, raise your hand, they don't hear that for a while. There's a lag. So I don't know how long that lag is or how much time we need to wait for that, but there is a lag on their end, so they're not hearing our words at the same time they're being said here. Could we, like maybe at the beginning, I know you do folks in the room first, but maybe like the screen that they're seeing at home could say like for those folks online, and like your public comment will be taken after in room and then have the directions, so they're seeing it on the screen as well as hearing it? I see that you.


6:42 p.m.

You might want to say something. Well, that's actually Eric who would be doing that, and I bet he could. We'll discuss it. Okay. And in the meantime, while they're figuring out if they can do that, I think it's a great idea that we specifically, at the top of the meeting, give people time to hear that, think about it, and be ready as things move on. Is there potential for, like, a minimum amount of time? It's like, okay, for the next five minutes, we'll wait to see if there's public comment, give them five minutes, and if there's nothing received within five minutes or three minutes, whatever it may be, then that's significant time. I mean, because we have, I mean, I'm not picking on any particular class, but maybe some of the elderly aren't quite as savvy with the computer, and it might take them a minute or two to figure out how to get online, how to get the sound going, figure out where the speakers are at. I don't know. I'm open to that if that is the commission's desire. That would require us to.


6:43 p.m.

We'll be sitting here not talking about anything for several minutes because we can't move on past public comment until we have received all of our public comment. I guess that was my legal question. Can you have public comment and then do consent agenda and then have like a second round public comment? No, but again, but even before, oh, excuse me. Sorry, I was speaking and I forgot I have to actually speak into a mic for public purposes. We can move public comment and re-agendize it later in the meeting if you'd like, but no, if we do public comment once, it should really be one item. I think if we just started the meeting with a note that we're going to be taking public comment after the pledge and after the roll, and those of you... If there are any of you that would like to comment that are online, you need to raise your hand by pressing... And they could...


6:44 p.m.

We could use that time. Yeah. In some way. Yeah, I think that's it. I think I can just, in my brain, add a housekeeping where it's like, agendas are in the corner. If you plan to speak online, here's how you're going to do it, our public comment. Right. Hopefully that'll help. Any other discussion? I have a question. It came up tonight, and in the last meeting, there was an item where they had renewed their permit, and the Valadios were here tonight for renewal. I guess it's two years. Is that two-year time frame set in the subdivision map act, set by the county? It comes up fast. I mean, I thought we just heard the Valadio when I saw that come up. Yeah. It does come up fast, and it is out of the state subdivision, subdivision map act. So we can't have it be four years or three years or something else. There are two.


6:45 p.m.

Your extensions and there are only a limited number of them that that are available to two maps. Okay. Any other discussion pieces Okay, I Believe that concludes everything on the agenda for the evening. So we're gonna go ahead and adjourn to May 7th 2026 Thank you You