Power Outage in Miranda
Updates from PG&E
1:09 p.m.
Started | Friday, March 29, 2019 @ 12:15 p.m. |
Customers affected | Two |
Cause | Our preliminary determination is that your outage was caused by an equipment issue. |
PG&E status | PG&E is assessing the cause at the outage location. |
Estimated time of restoral | Friday, March 29, 2019 @ 4:45 p.m. |
1:18 p.m.
PG&E status | PG&E is sending a repair crew to the outage location. |
1:49 p.m.
PG&E status | PG&E repair crew is en route to the outage location. |
PG&E ETA | 2:45 p.m. |
Estimated time of restoral | Friday, March 29, 2019 @ 6 p.m. |
2:06 p.m.
PG&E status | PG&E repair crew is on-site working to restore power. |
PG&E ETA | 2:05 p.m. |
5:42 p.m.
PG&E status | Power restored. |